Laundry progress
Well, Tim has installed a new toilet, a plumber has come in to move the taps in the laundry so that our laundry tub can now be flush against the wall in the corner of the room and Tim has removed part of the masonite panels and installed some of the dado boards.
This is the air compressor that we bought that Tim is using for the staple gun to staple the dado boards into the wall:
Here is a small panel of wall with some of the insulation in it:
And here is a photo of the completed panel with the dado boards installed:
The toilet has also had the masonite removed and dado boards installed, so we’re now about a quarter of the way through the dado board installation. After the dado boards have been installed then we need to cut cement sheeting to size and lay it on the floor boards then we can tile.